SACRAMENTO, CA
BRIDGEWAY TOWER (PRIORITY)
3 devices · 500 N ST, SACRAMENTO, CA, 95814
Work history
Who worked this, and when · ProInspection
Last inspected Dec 10, 2025
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 1980 · overhead traction · 2,500 lb · 400 fpm · 15 stops · last inspected Dec 10, 2025
- Passenger · installed 1980 · overhead traction · 2,500 lb · 400 fpm · 15 stops · last inspected Dec 10, 2025
- Wheelchair lift · installed 2019 · Garaventa Ltd. · roped hydro · 750 lb · 17 fpm · 2 stops · last inspected Dec 10, 2025