SAN DIEGO, CA
METROP WASTEWATER
3 devices · 4949 EASTGATE ML, SAN DIEGO, CA, 92121
Work history
Who worked this, and when · ProInspection
Last inspected Jul 10, 2025
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 1996 · hydroelectric · 2,500 lb · 125 fpm · 2 stops · last inspected Jul 10, 2025
- Freight · installed 1995 · Schindler Elevator Corporation · hydroelectric · 8,000 lb · 100 fpm · 3 stops · last inspected Jul 10, 2025
- Passenger · installed 1997 · Otis Elevator Company · overhead traction · 3,500 lb · 200 fpm · 4 stops · last inspected Jul 10, 2025