PALM DESERT, CA
HECKMANN CENTER
3 devices · 75-080 FRANK SINATRA DR, PALM DESERT, CA, 92211
Work history
Who worked this, and when · ProInspection
Last inspected Aug 4, 2025
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 2005 · hydroelectric · 3,500 lb · 125 fpm · 2 stops · last inspected Aug 4, 2025
- Passenger · installed 2005 · hydroelectric · 3,500 lb · 125 fpm · 2 stops · last inspected Aug 4, 2025
- Wheelchair lift · installed 2005 · Garaventa Ltd. · 750 lb · 17 fpm · 2 stops · last inspected Aug 4, 2025