SAN DIEGO, CA
CROSSROADS
3 devices · 404 CAMINO DEL RIO S, SAN DIEGO, CA, 92108
Work history
Who worked this, and when · ProInspection
Last inspected Jul 16, 2025
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 1979 · overhead traction · 2,500 lb · 350 fpm · 7 stops · last inspected Jul 16, 2025
- Passenger · installed 2014 · overhead traction · 2,500 lb · 350 fpm · 7 stops · last inspected Jul 16, 2025
- Passenger · installed 1979 · overhead traction · 2,500 lb · 350 fpm · 7 stops · last inspected Jul 16, 2025