OCEANSIDE, CA
CUBE SMART
6 devices · 201 VIA EL CENTRO, OCEANSIDE, CA, 92058
Work history
Who worked this, and when · ProInspection
Last inspected Sep 19, 2025
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Other · installed 1988 · Pflow (VRC) · roped hydro · 2,000 lb · 20 fpm · 2 stops · last inspected Sep 19, 2025
- Other · installed 1988 · Pflow (VRC) · roped hydro · 2,000 lb · 20 fpm · 2 stops · last inspected Sep 19, 2025
- Other · installed 1994 · Pflow (VRC) · roped hydro · 2,000 lb · 20 fpm · 2 stops · last inspected Sep 19, 2025
- Other · installed 1988 · Pflow (VRC) · roped hydro · 2,000 lb · 20 fpm · 2 stops · last inspected Sep 19, 2025
- Other · installed 1988 · Pflow (VRC) · roped hydro · 2,000 lb · 20 fpm · 2 stops · last inspected Sep 19, 2025
- Other · installed 1988 · Pflow (VRC) · roped hydro · 2,000 lb · 20 fpm · 2 stops · last inspected Sep 19, 2025