SAN FRANCISCO, CA
240 JONES ST
3 devices · 240 JONES ST, SAN FRANCISCO, CA, 94102
Work history
Who worked this, and when · ProInspection
Last inspected Mar 3, 2025
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Other · hydroelectric · 1,500 lb · 25 fpm · 2 stops · last inspected Mar 3, 2025
- Passenger · installed 2000 · overhead traction · 2,000 lb · 150 fpm · 7 stops · last inspected Mar 3, 2025
- Passenger · installed 2000 · Smartrise Engineering · overhead traction · 2,000 lb · 150 fpm · 7 stops · last inspected Mar 3, 2025