SAN DIEGO, CA
VALLEY RIM OFFICE
3 devices · 3517 CAMINO DEL RIO S, SAN DIEGO, CA, 92108
Work history
Who worked this, and when · ProInspection
Last inspected Nov 4, 2025
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 1988 · hydroelectric · 3,500 lb · 150 fpm · 6 stops · last inspected Dec 2, 2025
- Passenger · installed 1988 · hydroelectric · 3,500 lb · 150 fpm · 6 stops · last inspected Nov 4, 2025
- Passenger · installed 2010 · TK Elevator Corporation · hydroelectric · 3,500 lb · 130 fpm · 3 stops · last inspected Nov 4, 2025