ANAHEIM, CA
CUBE SMART
6 devices · 1628 ANAHEIM WY S, ANAHEIM, CA, 92805
Work history
Who worked this, and when · ProInspection
Last inspected Jul 3, 2025
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Other · installed 2024 · AJAY Equipment Corporation · roped hydro · 2,000 lb · 15 fpm · 2 stops · last inspected May 29, 2026
- Other · installed 2024 · Pflow (VRC) · roped hydro · 2,000 lb · 15 fpm · 2 stops · last inspected May 29, 2026
- Other · installed 2024 · Pflow (VRC) · roped hydro · 200 lb · 15 fpm · 2 stops · last inspected May 29, 2026
- Other · installed 2024 · Pflow (VRC) · roped hydro · 2,000 lb · 22 fpm · 2 stops · last inspected Jul 3, 2025
- Other · installed 2024 · Pflow (VRC) · roped hydro · 2,000 lb · 30 fpm · 2 stops · last inspected Jul 3, 2025
- Other · installed 2024 · Pflow (VRC) · roped hydro · 2,000 lb · 30 fpm · 2 stops · last inspected Jul 3, 2025