MARINA DEL REY, CA
PIER 44 BLDG 6
6 devices · 4625 ADMIRALTY WY, MARINA DEL REY, CA, 90292
Work history
Who worked this, and when · ProInspection
Last inspected Jun 2, 2026
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Wheelchair lift · installed 2020 · roped hydro · 750 lb · 20 fpm · 2 stops · last inspected Jun 2, 2026
- Wheelchair lift · installed 2020 · Guided Elevator · roped hydro · 750 lb · 20 fpm · 2 stops · last inspected Jun 2, 2026
- Wheelchair lift · installed 2020 · roped hydro · 750 lb · 20 fpm · 2 stops · last inspected Jun 2, 2026
- Wheelchair lift · installed 2020 · roped hydro · 750 lb · 20 fpm · 10 stops · last inspected Jun 2, 2026
- Wheelchair lift · installed 2020 · roped hydro · 750 lb · 20 fpm · 2 stops · last inspected Jun 2, 2026
- Passenger · installed 2020 · Otis Elevator Company · hydroelectric · 3,500 lb · 125 fpm · 2 stops · last inspected Jun 2, 2026