SAN FRANCISCO, CA
Courtyard Marriott
4 devices · 580 BEACH ST, SAN FRANCISCO, CA, 94133
Work history
Who worked this, and when · ProInspection
Last inspected Mar 14, 2024
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 1978 · hydroelectric · 4,000 lb · 125 fpm · 5 stops · last inspected Mar 14, 2024
- Passenger · installed 1978 · hydroelectric · 2,000 lb · 200 fpm · 4 stops · last inspected Dec 11, 2023
- Passenger · installed 1978 · hydroelectric · 2,500 lb · 200 fpm · 4 stops · last inspected Dec 11, 2023
- Wheelchair lift · installed 2015 · Garaventa Ltd. · 660 lb · 20 fpm · 2 stops · last inspected Dec 11, 2023