SAN DIEGO, CA
BALBOA THEATRE RENOV
4 devices · 868 4TH AV, SAN DIEGO, CA, 92101
Work history
Who worked this, and when · ProInspection
Last inspected Jun 30, 2026
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 2008 · hydroelectric · 4,000 lb · 80 fpm · 6 stops · last inspected Jun 30, 2026
- Wheelchair lift · installed 2007 · Garaventa Ltd. · rack and pinion · 495 lb · 13 fpm · 2 stops · last inspected Jun 30, 2026
- Passenger · installed 2007 · Schindler Elevator Corporation · hydroelectric · 4,500 lb · 100 fpm · 2 stops · last inspected Jun 30, 2026
- Wheelchair lift · installed 2023 · RAM Manufacturing Ltd. · screwdrive · 750 lb · 10 fpm · 2 stops · last inspected Jun 30, 2026