ANAHEIM, CA
CORE
5 devices · 1815 WESTSIDE DR, ANAHEIM, CA, 92805
Work history
Who worked this, and when · ProInspection
Last inspected Nov 13, 2025
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 2018 · Thurston Elevator Concepts, Inc. · hydroelectric · 3,500 lb · 150 fpm · 6 stops · last inspected Nov 13, 2025
- Passenger · installed 2018 · Thurston Elevator Concepts, Inc. · hydroelectric · 3,500 lb · 150 fpm · 6 stops · last inspected Nov 13, 2025
- Passenger · installed 2018 · Thurston Elevator Concepts, Inc. · hydroelectric · 3,500 lb · 150 fpm · 5 stops · last inspected Nov 13, 2025
- Passenger · installed 2018 · Thurston Elevator Concepts, Inc. · hydroelectric · 3,500 lb · 150 fpm · 5 stops · last inspected Nov 13, 2025
- Passenger · installed 2018 · Thurston Elevator Concepts, Inc. · hydroelectric · 3,500 lb · 150 fpm · 5 stops · last inspected Nov 13, 2025