PALO ALTO, CA
SHERATON HOTEL
5 devices · 625 EL CAMINO REAL, PALO ALTO, CA, 94301
Work history
Who worked this, and when · ProInspection
Last inspected Apr 29, 2024
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 1973 · hydroelectric · 1,900 lb · 2 stops · last inspected Apr 29, 2024
- Passenger · installed 1973 · hydroelectric · 3,500 lb · 150 fpm · 4 stops · last inspected Apr 29, 2024
- Passenger · installed 1973 · hydroelectric · 3,500 lb · 150 fpm · 5 stops · last inspected Apr 29, 2024
- Passenger · installed 1991 · hydroelectric · 3,500 lb · 160 fpm · 5 stops · last inspected Apr 29, 2024
- Passenger · installed 2021 · Mitsubishi Electric US, Inc . · hydroelectric · 4,000 lb · 125 fpm · 2 stops · last inspected Apr 29, 2024