CHULA VISTA, CA
FREDERICKA MANOR
4 devices · 183 3RD AV, CHULA VISTA, CA, 91910
Work history
Who worked this, and when · ProInspection
Last inspected Oct 29, 2025
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 1964 · hydroelectric · 4,000 lb · 60 fpm · 2 stops · last inspected Apr 15, 2026
- Passenger · installed 1964 · hydroelectric · 3,000 lb · 175 fpm · 8 stops · last inspected Oct 29, 2025
- Passenger · installed 1964 · hydroelectric · 3,000 lb · 175 fpm · 8 stops · last inspected Apr 28, 2026
- Passenger · installed 1988 · overhead traction · 4,500 lb · 200 fpm · 8 stops · last inspected Jul 30, 2025