BURBANK, CA
AMC THEATRE
5 devices · 350 N FIRST ST, BURBANK, CA, 91501
Work history
Who worked this, and when · ProInspection
Last inspected May 12, 2026
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Escalator · installed 2003 · Schindler Elevator Corporation · escalator · 5,668 lb · 90 fpm · 2 stops · last inspected Jun 8, 2026
- Passenger · installed 2003 · Schindler Elevator Corporation · hydroelectric · 2,500 lb · 150 fpm · 3 stops · last inspected May 12, 2026
- Passenger · installed 2003 · Schindler Elevator Corporation · hydroelectric · 2,500 lb · 150 fpm · 3 stops · last inspected May 12, 2026
- Passenger · installed 2003 · Schindler Elevator Corporation · hydroelectric · 2,500 lb · 150 fpm · 2 stops · last inspected May 12, 2026
- Passenger · installed 2003 · Schindler Elevator Corporation · hydroelectric · 2,500 lb · 150 fpm · 2 stops · last inspected Mar 9, 2026