STOCKTON, CA
CEASAR CHAVEZ HS
7 devices · 2929 WINDFLOWER LN, STOCKTON, CA, 95212
Work history
Who worked this, and when · ProInspection
Last inspected Feb 12, 2026
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 2005 · hydroelectric · 3,000 lb · 150 fpm · 3 stops · last inspected Feb 12, 2026
- Passenger · installed 2005 · hydroelectric · 2,500 lb · 150 fpm · 2 stops · last inspected Feb 12, 2026
- Passenger · installed 2005 · hydroelectric · 2,500 lb · 150 fpm · 2 stops · last inspected Feb 12, 2026
- Passenger · installed 2005 · hydroelectric · 2,500 lb · 150 fpm · 2 stops · last inspected Feb 12, 2026
- Passenger · installed 2005 · hydroelectric · 2,500 lb · 150 fpm · 2 stops · last inspected Feb 12, 2026
- Passenger · installed 2005 · hydroelectric · 2,500 lb · 150 fpm · 2 stops · last inspected Feb 12, 2026
- Wheelchair lift · installed 2006 · National W heet-Vator Co. · hydroelectric · 750 lb · 20 fpm · 3 stops · last inspected Feb 12, 2026