SAN DIEGO, CA
ACADEMY OF OUR LADY PEACE
4 devices · 4860 OREGON ST, SAN DIEGO, CA, 92116
Work history
Who worked this, and when · ProInspection
Last inspected Apr 23, 2026
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Wheelchair lift · installed 1993 · screwdrive · 750 lb · 2 stops · last inspected Apr 23, 2026
- Wheelchair lift · installed 2002 · Porch-Lift · roped hydro · 750 lb · 15 fpm · 2 stops · last inspected Apr 23, 2026
- Passenger · installed 2014 · Otis Elevator Company · hydroelectric · 3,500 lb · 125 fpm · 2 stops · last inspected Apr 23, 2026
- Passenger · installed 2020 · TK Elevator Corporation · hydroelectric · 5,000 lb · 80 fpm · 2 stops · last inspected Apr 23, 2026