DALY CITY, CA
SERRAMONTE CENTER
5 devices · 3 SERRAMONTE CTR, DALY CITY, CA, 94015
Work history
Who worked this, and when · ProInspection
Last inspected Dec 9, 2025
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Freight · installed 1968 · hydroelectric · 5,000 lb · 60 fpm · 2 stops · last inspected Dec 9, 2025
- Freight · installed 1968 · hydroelectric · 5,000 lb · 60 fpm · 2 stops · last inspected Dec 9, 2025
- Freight · installed 1968 · hydroelectric · 5,000 lb · 60 fpm · 2 stops · last inspected Dec 9, 2025
- Passenger · installed 2017 · Schindler Elevator Corporation · hydroelectric · 3,500 lb · 150 fpm · 5 stops · last inspected Mar 27, 2026
- Passenger · installed 2017 · Schindler Elevator Corporation · hydroelectric · 3,500 lb · 150 fpm · 5 stops · last inspected Mar 27, 2026