SAN DIEGO, CA
HUBBS RESEARCH FACILITY
7 devices · 1720 SHORES RD S, SAN DIEGO, CA, 92109
Work history
Who worked this, and when · ProInspection
Last inspected Jul 16, 2025
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Moving walk · installed 1983 · escalator · 37,999 lb · 90 fpm · 2 stops · last inspected Jul 16, 2025
- Passenger · installed 1988 · hydroelectric · 2,500 lb · 125 fpm · 2 stops · last inspected Jul 17, 2025
- Passenger · installed 1988 · hydroelectric · 2,500 lb · 125 fpm · 2 stops · last inspected Jul 17, 2025
- Passenger · installed 1994 · hydroelectric · 2,000 lb · 80 fpm · 2 stops · last inspected Jul 17, 2025
- Passenger · installed 1997 · hydroelectric · 8,900 lb · 120 fpm · 2 stops · last inspected Mar 24, 2026
- Wheelchair lift · installed 1994 · screwdrive · 750 lb · 9 fpm · 2 stops · last inspected Jul 17, 2025
- Passenger · installed 2003 · TK Elevator Corporation · hydroelectric · 3,500 lb · 100 fpm · 2 stops · last inspected Jul 17, 2025