REDWOOD CITY, CA
TE CONNECTIVITY WIRE & CABLE
5 devices · 501 OAKSIDE AV, REDWOOD CITY, CA, 94063
Work history
Who worked this, and when · ProInspection
Last inspected Jan 10, 2022
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 1998 · hydroelectric · 6,000 lb · 90 fpm · 2 stops · last inspected Jan 10, 2022
- Passenger · installed 1998 · hydroelectric · 6,000 lb · 90 fpm · 2 stops · last inspected Jan 10, 2022
- Other · installed 2018 · Pflow (VRC) · hydroelectric · 6,000 lb · 24 fpm · 2 stops · last inspected Jan 10, 2022
- Other · installed 2018 · Pflow (VRC) · hydroelectric · 6,000 lb · 24 fpm · 2 stops · last inspected Jan 10, 2022
- Other · installed 2019 · Pflow (VRC) · chain · 3,000 lb · 25 fpm · 3 stops · last inspected Jan 10, 2022