SAN DIEGO, CA
COLLEGE AVE BAPTIST CHURCH
3 devices · 4747 COLLEGE AV, SAN DIEGO, CA, 92115
Work history
Who worked this, and when · ProInspection
Last inspected Mar 24, 2026
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 1979 · hydroelectric · 2,000 lb · 75 fpm · 2 stops · last inspected Mar 24, 2026
- Passenger · installed 1981 · hydroelectric · 2,000 lb · 100 fpm · 2 stops · last inspected Mar 24, 2026
- Passenger · installed 1993 · hydroelectric · 3,500 lb · 125 fpm · 3 stops · last inspected Mar 24, 2026