SAN FRANCISCO, CA
240 POST ST
7 devices · 240 POST ST, SAN FRANCISCO, CA, 94108
Work history
Who worked this, and when · ProInspection
Last inspected Apr 29, 2026
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 1991 · hydroelectric · 3,500 lb · 150 fpm · 5 stops · last inspected Apr 29, 2026
- Escalator · installed 2013 · Schindler Elevator Corporation · chain · 100 fpm · last inspected Apr 13, 2026
- Escalator · installed 2013 · Schindler Elevator Corporation · escalator · 100 fpm · last inspected Apr 13, 2026
- Escalator · installed 2013 · Schindler Elevator Corporation · chain · 100 fpm · last inspected Apr 13, 2026
- Escalator · installed 2013 · Schindler Elevator Corporation · belt · 100 fpm · last inspected Apr 13, 2026
- Escalator · installed 2013 · Schindler Elevator Corporation · escalator · 100 fpm · last inspected Apr 13, 2026
- Escalator · installed 2013 · Schindler Elevator Corporation · escalator · 100 fpm · last inspected Apr 13, 2026