SAN DIEGO, CA
WORLDMARK
4 devices · 425 CAMINO DEL RIO S, SAN DIEGO, CA, 92108
Work history
Who worked this, and when · ProInspection
Last inspected Mar 19, 2026
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 1990 · hydroelectric · 2,500 lb · 160 fpm · 5 stops · last inspected Mar 19, 2026
- Passenger · installed 1990 · hydroelectric · 2,500 lb · 160 fpm · 5 stops · last inspected Mar 19, 2026
- Passenger · installed 1990 · hydroelectric · 2,500 lb · 160 fpm · 5 stops · last inspected Mar 19, 2026
- Passenger · installed 1990 · hydroelectric · 2,500 lb · 160 fpm · 5 stops · last inspected Mar 19, 2026