SAN FRANCISCO, CA
150 GREENWICH ST
3 devices · 150 GREENWICH ST, SAN FRANCISCO, CA, 94111
Work history
Who worked this, and when · ProInspection
Last inspected Jul 3, 2019
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 1990 · hydroelectric · 2,500 lb · 80 fpm · 2 stops · last inspected Jun 20, 2019
- Wheelchair lift · installed 2002 · McKinley Equipment Corporation · screwdrive · 750 lb · 9 fpm · 2 stops · last inspected Jun 20, 2019
- Passenger · installed 2018 · Savaria Concord Lifts Inc. · hydroelectric · 1,400 lb · 30 fpm · 2 stops · last inspected Jul 3, 2019