SANTA CLARA, CA
Guadalupe Hall
3 devices · 455 EL CAMINO REAL, SANTA CLARA, CA, 95050
Work history
Who worked this, and when · ProInspection
Last inspected Oct 27, 2025
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 2001 · hydroelectric · 4,500 lb · 100 fpm · 3 stops · last inspected Oct 27, 2025
- Passenger · installed 2001 · hydroelectric · 3,500 lb · 150 fpm · 3 stops · last inspected Oct 27, 2025
- Passenger · installed 2001 · hydroelectric · 3,500 lb · 150 fpm · 3 stops · last inspected Oct 27, 2025