PERRY, OH
PERRY NUCLEAR POWER PLANT
8 devices · 10 CENTER ST, PERRY, OH, 44081
Work history
Who worked this, and when · ProInspection
Last inspected Jan 20, 2026
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 1982 · HYDRAULIC DIRECT (H) · 3,500 lb · 125 fpm · 3 stops · last inspected Jan 20, 2026
- Dumbwaiter · installed 1988 · DUMBWAITER NO SAFETY (DW) · 500 lb · 50 fpm · 2 stops · last inspected Jan 20, 2026
- Passenger · installed 1993 · HYDRAULIC DIRECT (H) · 3,000 lb · 100 fpm · 2 stops · last inspected Jan 20, 2026
- Passenger · installed 1983 · ELECTRIC DRUM/TRACT (E) · 3,500 lb · 350 fpm · 6 stops · last inspected Jan 20, 2026
- Passenger · installed 1983 · HYDRAULIC DIRECT (H) · 3,500 lb · 125 fpm · 2 stops · last inspected Jan 20, 2026
- Passenger · installed 1984 · ELECTRIC DRUM/TRACT (E) · 5,000 lb · 350 fpm · 4 stops · last inspected Jan 20, 2026
- Passenger · installed 1984 · ELECTRIC DRUM/TRACT (E) · 5,000 lb · 350 fpm · 5 stops · last inspected Jan 20, 2026
- Passenger · installed 1984 · ELECTRIC DRUM/TRACT (E) · 5,000 lb · 350 fpm · 6 stops · last inspected Jan 20, 2026