OXFORD, OH
MSU SCOTT HALL
3 devices · 400 MAPLE AVE, OXFORD, OH, 45056
Work history
Who worked this, and when · ProInspection
Last inspected Jun 4, 2025
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 2018 · HYDRAULIC DIRECT (H) · 3,500 lb · 125 fpm · 4 stops · last inspected Jun 16, 2025
- Passenger · installed 2018 · HYDRAULIC DIRECT (H) · 3,500 lb · 125 fpm · 4 stops · last inspected Jun 16, 2025
- Wheelchair lift · installed 2018 · SCREWDRIVE (SCREW) · 750 lb · 10 fpm · 2 stops · last inspected Jun 4, 2025