OAK HARBOR, OH
DAVIS BESSE NUCLEAR POWER STATION
11 devices · 5501 SR 2, OAK HARBOR, OH, 43449
Work history
Who worked this, and when · ProInspection
Last inspected Jul 23, 2025
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 1973 · ELECTRIC DRUM/TRACT (E) · 3,500 lb · 250 fpm · 5 stops · last inspected Jul 22, 2025
- Passenger · installed 1973 · ELECTRIC DRUM/TRACT (E) · 3,500 lb · 200 fpm · 5 stops · last inspected Jul 22, 2025
- Passenger · installed 1973 · ELECTRIC DRUM/TRACT (E) · 3,500 lb · 250 fpm · 5 stops · last inspected Jul 23, 2025
- Passenger · installed 1973 · ELECTRIC DRUM/TRACT (E) · 3,500 lb · 200 fpm · 5 stops · last inspected Jul 22, 2025
- Passenger · installed 1981 · HYDRAULIC DIRECT (H) · 3,000 lb · 75 fpm · 2 stops · last inspected Jul 23, 2025
- Dumbwaiter · installed 1981 · DUMBWAITER NO SAFETY (DW) · 200 lb · 50 fpm · 2 stops · last inspected Jul 23, 2025
- Passenger · installed 1986 · ELECTRIC DRUM/TRACT (E) · 2,000 lb · 200 fpm · 6 stops · last inspected Jul 23, 2025
- Dumbwaiter · installed 1986 · DUMBWAITER W/SAFETY (DWS) · 150 lb · 75 fpm · 5 stops · last inspected Jul 22, 2025
- Passenger · installed 1986 · ELECTRIC DRUM/TRACT (E) · 3,000 lb · 200 fpm · 5 stops · last inspected Jul 22, 2025
- Passenger · installed 1989 · HYDRAULIC DIRECT (H) · 3,000 lb · 150 fpm · 2 stops · last inspected Jul 23, 2025
- Passenger · installed 2011 · HYDRAULIC DIRECT (H) · 5,000 lb · 150 fpm · 4 stops · last inspected Jul 23, 2025