PRINCETON-CONSOLIDATED, NJ
MACKAY CAMPUS CENTER
6 devices · MERCER ST, PRINCETON-CONSOLIDATED, NJ
Work history
Who worked this, and when · ProInspection
Last inspected Sep 24, 2025 · status Cc
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Elevator (unspec.) · installed 1986 · hydraulic · 2,500 lb · 125 fpm · last inspected Aug 3, 2026 · Cc
- Elevator (unspec.) · installed 1989 · hydraulic · 2,500 lb · 125 fpm · last inspected Sep 24, 2025 · Cc
- Elevator (unspec.) · installed 1978 · hydraulic · 1,500 lb · 125 fpm · last inspected Sep 9, 2026 · Cc
- Elevator (unspec.) · installed 1980 · winding_drum · 500 lb · 50 fpm · last inspected Aug 24, 2026 · Cc
- Elevator (unspec.) · installed 1991 · hydraulic · 2,100 lb · 100 fpm · last inspected Jan 5, 2026 · Cc
- Wheelchair lift · installed 1991 · 450 lb · 20 fpm · last inspected Jan 5, 2026 · Cc